Production capacity(t/d) | 50 | 100 | 150 | 200 | 300 | 400 |
---|---|---|---|---|---|---|
Major equipment | Main supporting equipment models and technical and economic indicators | |||||
Distributor | BL-1 | BL-2 | BL-2 | BL-3 | BL-3 | BL-4V |
Shaft kiln | 60m³ | 150m³ | 200m³ | 250m³ | 400m³ | 500m³ |
Kiln section form | Round shape | |||||
Ash machine | WF-1 | WF-2 | WF-2 | WF-3 | WF-4 | WF-5 |
Calcination temperature /℃ | 1100±50 | |||||
Energy consumption index /(kCal/kg lime) | 950±50 | |||||
Power consumption index /(kW·h/t lime) | 25±5 | |||||
limestone : lime | 1.6~1.75:1 | |||||
Lime overburning rate /% | ≤13 | |||||
Lime activity /ml | 220~280(It depends on the composition of limestone) | |||||
Ash out temperature /℃ | Ambient temperature +60 | |||||
Granularity of limestone into kiln /mm | 30~80/80~120 | |||||
Emission concentration /(mg/Nm3) | ≤30 | |||||
Number of working days per year / day | ≥340 | |||||
Overhaul cycle / year | 3~5 | |||||
Number of operators / (people / group) | 2 | |||||
Applicable fuel | Lump anthracite, lump coke, lump petroleum coke, lump biomass fuel, etc. |